Staff Engineer in Chelsea , MA for MWRA (Massachusetts Water Resources Authority)
| Cart Total:
Career Center

Careers in Quality

 

Job Seekers, Welcome to ASQ Career Center
Search Filters
Use this area to filter your search results. Each filter option allows for multiple selections.
Search Results: 782 Jobs
Save Agent
Loading... Please wait.
MWRA (Massachusetts Water Resources Authority) Logo
MWRA (Massachusetts Water Resources Authority)

Chelsea , Massachusetts

Kluber Lubrication Logo
Kluber Lubrication

Londonderry, New Hampshire

NEW! NEW!
National Industries for the Blind Logo
National Industries for the Blind

Alexandria, Virginia

NEW! NEW!
Guilford Performance textiles By Lear Logo
Guilford Performance textiles By Lear

Nationwide

NEW! NEW!
Confidential

Temple, Texas

MW Components

Fairfield, New Jersey

Owens Corning

Sedalia, Missouri

Leatherman Tool Group Inc. Logo
Leatherman Tool Group Inc.

Portland, Oregon

Aesculap Implant Systems

Hazelwood, Missouri

Pioneer Metal Finishing

Union City, California

Recro CDMO Logo
Recro CDMO

Gainesville, Georgia

Shearer's Foods

Phoenix, Arizona

Air Liquide

Newport, Delaware

Kerotest Manufacturing Logo
Kerotest Manufacturing

Pittsburgh, Pennsylvania

Rockline Industries Logo
Rockline Industries

Sheboygan, Wisconsin

Recro CDMO Logo
Recro CDMO

Gainesville, Georgia

HonorBridge Logo
HonorBridge

Durham, North Carolina

Plasma Protein Therapeutics Association

Annapolis, Maryland

Metro Vancouver Regional District

Burnaby, British Columbia, Canada

Travere Therapeutics

San Diego, California

Pactiv Evergreen

Corsicana, Texas

Loading... Please wait.
Expand Show Other Jobs
Job Saved Save Job
Employer Logo
Association Logo
Staff Engineer
MWRA (Massachusetts Water Resources Authority)
Email Print
Employer Logo
About MWRA (Massachusetts Water Resources Authority)
MWRA is a public authority established by an act of the Legislature in 1984 to provide wholesale water and sewer services to 3.1 million people and more than 5,500 large industrial users in 61 communities in eastern and central Massachusetts. System Overview MWRA assets are located in an area of more than 800 square miles, spanning from the Chicopee Valley to Boston Harbor. MWRA’s water system has more than 200 separate facilities, including the John J. Carroll Water Treatment Plant, with a capacity of 405 million gallons per day (mgd), the William A. Brutsch Water Treatment Facility, with a capacity of 16 mgd, 11 pump stations, and 14 below- or above-ground storage tanks. The water transmission system has 105 miles of active tunnels and aqueducts (mostly 10 to 14 feet in diameter) and 39 miles of standby aqueducts. MWRA’s wastewater system has 65 facilities, including two treatment plants, the Deer Island Treatment Plant, with a capacity of 1.27 billion gallons per day, and the Clinton Advanced Wastewater Treatment Plant, with a capacity of 12 milliongallons per day. There are 13 pumping stations, a screen house and four remote head works, four Combined Sewer Overflow... (CSO) facilities, and two CSO storage facilities. Since its creation in 1985, MWRA has invested more than $6 billion in essential new facilities. In addition to the clean-up of Boston Harbor and the modernization of the region’s water system, MWRA maintains hundreds of miles of water and sewer pipes, and dozens of other facilities that regularly require either upgrades or replacements. MWRA has also established aggressive maintenance programs to ensure that these facilities never fall back into a cycle of disrepair.
Connections working at MWRA (Massachusetts Water Resources Authority)
More Jobs from This Employer
https://careers.asq.org/jobs/16055720/staff-engineer
Loading. Please wait.
Powered By Naylor Association Solutions